Monday, August 23, 2010

Celadon Enterprises Launches!

Check out my new website! www.CeladonEnterprises.com! We provide Utility Management Dashboard to give large commercial building owners up to the minute information about their usage. We also provide easy techniques to reduce energy spend up to 25%! Come check us out or call us at (877) 722-1028

Sunday, June 28, 2009

Ropatec American Installation 6/27/09





Please see pictures of Ropatec's installation of the 6 KW Maxi Vertical in Virginia Dale, CO. (For more information go to: www.Ropatec.com)

This is what the turbine looks like uninstalled. It took two crains and a flat bed truck to get all the pieces of the turbine there and get it up on the pre-installed tower.




Here are some pics of the old double vertical before it was removed:

This is the old turbine that they removed.
Here are pictures and videos of putting the new turbine together:













Assembing the turbine:




Here is a picture of the base of the tower. As you can see it is quite small. Probably 6-8 ft in diameter. The commissioned a tower from a company that makes poles for ski lifts. The pole was about 40' ft tall. It probably should have been sited better and a little taller for more effective use of the machine.
See a picture of the inverter. The utility company now needs to hook this up to the grid.

Installing the Turbine on the Tower